Business Fora
Volume 9 | Issue 1 | 2026 | 20 – 38
Jonathan Jedidiah S. Ison, ORCID No. 0009 – 0000 – 6549 – 4900
Master of Science in Construction Management , Polytechnic University of the Philippines, Sta. Mesa, Manila, Philippines
Article History:
Initial submission: 14 August 2026
First decision: 20 August 2026
Revision received: 18 September 2026
Accepted for publication: 28 September 2026
Online release: 03 October 2026
Ready to submit? Click the button below.
Need more help before you submit?
Cost overruns remain a persistent challenge in private small-scale construction projects, adversely affecting project cost performance, resource utilization, and overall project success. This study examined the strategic approaches used to minimize cost overruns and developed a Cost Overrun Action Plan to support effective cost management in private small-scale construction projects. A quantitative descriptive-comparative research design was employed involving 30 construction professionals, including architects, engineers, contractors, project managers, and other practitioners in Quezon City, Philippines. Data were collected through a structured survey questionnaire and analyzed using frequency counts, percentages, weighted means, and the Kruskal-Wallis H Test. The findings revealed that respondents positively assessed cost control, risk management, financial operations, application of current technology, and lean construction and value engineering as effective approaches to minimizing cost overruns. Cost control received the strongest assessment, particularly regular budget monitoring and control measures (M = 4.46), while all other strategic dimensions were likewise rated favorably. Statistical analysis showed no significant differences in respondents’ assessments when grouped according to profession, years of professional experience, and number of projects completed, indicating a shared perception regarding the effectiveness of these approaches. The study concludes that an integrated approach combining cost control, risk management, financial operations, technology utilization, and lean construction and value engineering can strengthen project planning, resource optimization, financial control, and decision-making. Based on these findings, a Cost Overrun Action Plan was developed to provide construction professionals with a practical framework for preventing cost overruns and improving project performance.
Keywords: Cost Overrun, Construction Management, Cost Control, Risk Management, Value Engineering
APA (7th edition)
Ison, J. J. S. (2026). Strategic approaches in minimizing cost overruns in private small-scale construction projects: Basis for a proposed action plan in preventing cost overrun. Business Fora, 9(1), 20-38. https://doi.org/10.62718/vmca.bf-baiij.9.1.SC-0826-006.
Copyright @ 2026. The Author/s. Published by VMC Analytiks Multidisciplinary Journal News Publishing Services. Strategic Approaches in Minimizing Cost Overruns in Private Small – Scale Construction Projects: A Basis for a Proposed Action Plan in Preventing Cost Overrun © 2026 Jonathan Jedidiah S. Ison is an open access article licensed under Creative Commons Attribution (CC BY 4.0). This permits the copying, redistribution, remixing, transforming, and building upon the material in any medium or format for any purpose, even commercially, provided that appropriate credit is given to the copyright owner/s through proper and standard citation.
The sole author conceived and designed the study, developed the research instrument, collected and analyzed the data, interpreted the findings, prepared the Cost Overrun Action Plan, and wrote, reviewed, and approved the final manuscript. The author assumes full responsibility for the accuracy, integrity, and completeness of the work.
This research received no external funding.
The author declares no conflict of interest. The research was conducted without any commercial, financial, personal, or professional relationships that could be construed as having influenced the conduct, analysis, or findings of the study.
No formal ethics approval was obtained for this study. Although this study involved human participants, the study was conducted in accordance with ethical principles for research involving human participants. Participation was voluntary, and respondents were informed of their right to withdraw from the study at any stage. The confidentiality and anonymity of all respondents were strictly maintained, and the data collected were used solely for research purposes.
The datasets generated and analyzed during the current study are not publicly available due to confidentiality and privacy considerations concerning the research participants. However, the data may be obtained from the corresponding author upon reasonable request, subject to appropriate conditions for protecting the confidentiality and anonymity of the respondents.
AI-assisted language editing was performed using ChatGPT and Copilot to improve grammar, clarity, and readability of the manuscript. The author reviewed, revised, and approved all AI-assisted content and remains fully responsible for the accuracy, originality, interpretation, and final content of the manuscript.
– (Not available).
The views expressed in this article are those of the authors and do not necessarily reflect the views of the publisher. The publisher disclaims any responsibility for errors or omissions.